American Pile and Foundation was contracted to design, furnish materials, labor, and equipment to install 23,000 liner feet of Augercast CFA/Displacement Piles, including 11 reinforcing bars. The pile lengths were based on 45 inch tip to cut-off length. 3 compression load tests were performed to 30 tons.