American Pile and Foundation was subcontracted to install 243 foundation piles. This was a two-phase project with 91 piles in the first phase and 152 piles in the second phase. American Pile and Foundation provided the layout of our work as well as soft digging at each pile location to uncover any possible utilities just below the ground surface.