American Pile and Foundation was responsible for installing 52 caissons, 50 to 54 feet deep, with 42 inch permanent casing extending down 30 feet and 36 inch, segmental casing used to drill the full depth. Under separate contracts American Pile and Foundation installed over 300 linear feet of sheet pile walls. All work was installed with low headroom rigs due to proximity to catenary wires and tracks. The project included 900 yards of concrete, 120 tons of reinforcing steel, and 571 linear feet of casing weld.